Actual case
Use case OGEN
Limit interventions on-site.
Avoid emergency interventions due to freezing.
The solution Save Innovations
CONFIGURATION
Pipeline: DN100
Average flow rate: 10 m³/h
Pressure: 6 bars
Acceptable pressure drop: 1 bar
NEED
240 Wh/day, or 10 Wh continuously
1 heating cable
PERFORMANCE
312 Wh/day, or 13 Wh continuously
0.3 bar pressure drop
Issues
Ensure the quality of the distributed water and limit interventions.
Objectives
Prevent the dosing pump capillaries from freezing in winter at a pressure relief site in the mountains.
Requirements
The operator is looking for an autonomous power supply solution for a heating cable.
Constraints
The site is a mountain pressure relief station located in a remote area, so connecting to the EDF network would be too expensive, and the operation of solar panels is limited.
Stakeholders
Water union of an urban area.