Actual case

Use case OGEN

Limit interventions on-site.

Avoid emergency interventions due to freezing.

The solution Save Innovations

CONFIGURATION

Pipeline: DN100

Average flow rate: 10 m³/h

Pressure: 6 bars

Acceptable pressure drop: 1 bar

NEED

240 Wh/day, or 10 Wh continuously

1 heating cable

PERFORMANCE

312 Wh/day, or 13 Wh continuously

0.3 bar pressure drop

Issues

Ensure the quality of the distributed water and limit interventions.

Objectives

Prevent the dosing pump capillaries from freezing in winter at a pressure relief site in the mountains.

Requirements

The operator is looking for an autonomous power supply solution for a heating cable.

Constraints

The site is a mountain pressure relief station located in a remote area, so connecting to the EDF network would be too expensive, and the operation of solar panels is limited.

Stakeholders

Water union of an urban area.